Wednesday, May 9, 2012

Day 2 shower repair

Above and below are pictures showing the cement board installed, shower pan poured

 Here are a few pictures of rubber liner during installation
 Now to wait two weeks for shower floor to cure, We will be a applying a three coat epoxy system on shower floor. With a typical tile floor installation the two week wait time is not necessary.